http://sealaska.com
  •  
  •  
Thane Road Campground opens for the season

JUNEAU - Thane Road Campground opened this week, according to a release from the...is located 1.5 miles south of downtown Juneau on the east side of Thane Road. Thane campground is a primitive style campground with trash service and portable...

http://juneauempire.com/outdoors/2015-04-17/thane-road-campground-opens-season
Outdoors
Alberta Means

ALBERTA T. ""BUDDY"" MEANS Alberta Thane ""Buddy"" Means, 78, a resident of the Hillsboro community, died Friday morning, May 8, 2015 at Empres Healthcare in Hillsboro...

http://www.legacy.com/Link.asp?I=LS000174885018
Congrats, grads!

...retiring after 20 years of teaching.Thunder Mountain High SchoolAcross town at Thunder Mountain High School, valedictorians Thane Reishus-O'Brien and James Barnhill had advice to share for their approximately 120 fellow graduates - sort of."The teachers...

http://juneauempire.com/local/2015-05-25/congrats-grads
Local
Coast Guard plans loud noises

Coast Guard Station Juneau plans to hold flashbang grenade training from 10 a.m. to noon today in Gastineau Channel near Thane.In an email, a representative of Coast Guard Station Juneau explained that the Coast Guard will use a shotgun-mounted launcher...

http://juneauempire.com/local/2015-05-14/coast-guard-plans-loud-noises
Local
DOT installing 'avalanche cams' on Thane Road

...hasn't been an avalanche fatality on Thane Road since the 1970s, the Alaska Department...historically active avalanche chutes adjacent to Thane Road. The cameras will be ready to go...install railroad crossing-style gates on Thane Road to block traffic during "avalanche...

http://juneauempire.com/local/2013-08-21/dot-installing-avalanche-cams-thane-roa
Local
Thane Road construction work designed to improve area safety

The construction work near the curve by Sheep Creek on Thane Road is aimed at improving safety on the road. The surface is being repaved, and a guardrail is being installed. The road is...

http://juneauempire.com/local/2013-09-05/thane-road-construction-work-designed-i
Local
Thane no home for the homeless

...of evictions on its wooded property off Thane Road, Hlavacek and Gailliot have moved...camps sprout around the outskirts of the Thane Campground or in the campground itself.When "The Hill" was disbanded in 2009, the Thane Campground was left open for just that...

http://juneauempire.com/local/2015-02-27/thane-no-home-homeless
Local
Pure Sole: Dear JD: A basketball love story

Dear JD.I remember when we first met.It was 1903, I believe.Juneau, Thane, Treadwell, Douglas ... all of us standing along the channel.The mines people were there too.But it was you that caught...

http://juneauempire.com/sports/2015-04-17/dear-jd-basketball-love-story
Sports
Planning approves Thane Road easement for avalanche cameras

...avalanche-monitoring cameras at the Little Rock Dump along Thane Road.The Alaska Department of Transportation...CBJ-owned land.ADOT&PF owns and maintains Thane Road. The three avalanche paths that cross Thane are a hazard to vehicles and pedestrians...

http://juneauempire.com/local/2012-11-28/planning-approves-thane-road-easement-a
Local
Planning Commission unimpressed with Thane Road proposal

...Transportation's proposal for work on Thane Road, though it met the city's criteria...Legislature sent $4 million to spend on Thane Road.There are three strips along the...have such a significant speed disparity. Thane residents Stephen Wright and Bill Heumann...

http://juneauempire.com/local/2011-05-11/planning-commission-unimpressed-thane-r
Local

CONTACT US

  • Switchboard: 907-586-3740
  • Circulation and Delivery: 907-586-3740
  • Newsroom Fax: 907-586-3028
  • Business Fax: 907-586-9097
  • Accounts Receivable: 907-523-2270
  • View the Staff Directory
  • or Send feedback

ADVERTISING

SUBSCRIBER SERVICES

SOCIAL NETWORKING