http://sealaska.com

Refine Search

  •  
  •  
Port shifts focus to modernization

...Anchorage and the engineering company CH2M Hill are designing possible long-term solutions, with the basic idea to use steel piles filled with reinforced concrete, KSKA reported. If the steel corrodes in 20 years, the concrete remains.Port managers...

http://juneauempire.com/state/2014-09-17/port-shifts-focus-modernization
State
Update: Port of Anchorage shifts focus to modernization

...Anchorage and the engineering company CH2M Hill are designing possible long-term solutions, with the basic idea to use steel piles filled with reinforced concrete, KSKA reported. If the steel corrodes in 20 years, the concrete remains.Port managers...

http://juneauempire.com/state/2014-09-16/port-anchorage-shifts-focus-modernizati
State
State doesn't have money to replace Gustavus float

...told KTOO the float was designed to be removed if it appeared there would be issues because of weather.Five of the 10 steel piles holding the float in place were damaged in a December storm. He says it should have been unbolted and moved after that...

http://juneauempire.com/state/2014-08-13/state-doesn%E2%80%99t-have-money-replac
State
Port expansion manager urges dismissal of lawsuit

...placement of riprap where contractors would later try to drive piles. ICRC directed subcontractors to persist in installing steel piles when it was evident they were not going in correctly, Greenberg said. The company was deficient in quality control...

http://juneauempire.com/state/2014-01-12/port-expansion-manager-urges-dismissal-
State
Photo: Dock work

...Staging Area Phase 1 project will fill in the last break in the seawalk between Marine Park and the Princess Dock. A new steel pile supported system will have a timber surface. The overall project cost is $1.9 million and will be complete by May...

http://juneauempire.com/local/2013-02-27/photo-dock-work
Local
Port of Anchorage: A billion-dollar mess?

...those are no longer part of the plan. The project has been plagued by defects in structure and slow progress. The steel piles are supposed to hook one into the next down the entire length, creating a strong, interlocked structure. Instead...

http://www.juneauempire.com/stories/011711/sta_771120873.shtml
News
Cost woes plague Anchorage port expansion; scaled-down version proposed as alternative

...briefing. But the city doesn't have money in hand for either approach. The port turns 50 this year, and the old steel piles that hold up the dock are rusting out, officials say. The full-scale project involves creating a new dock face 1...

http://juneauempire.com/state/2011-05-15/cost-woes-plague-anchorage-port-expansi
State
Gov. Palin cancels materials contract for Lynn Canal road

...regional director. Palin did opt to keep two contracts for steel piles and culverts - one with LeBarge Pipe and Steel for...said officials from the governor's office. Unlike the steel piles and culverts, concrete girders were to be specifically...

http://www.juneauempire.com/stories/030107/sta_20070301021.shtml
News
1

CONTACT US

  • Switchboard: 907-586-3740
  • Circulation and Delivery: 907-586-3740
  • Newsroom Fax: 907-586-3028
  • Business Fax: 907-586-9097
  • Accounts Receivable: 907-523-2270
  • View the Staff Directory
  • or Send feedback

ADVERTISING

SUBSCRIBER SERVICES

SOCIAL NETWORKING