http://sealaska.com

Refine Search

  •  
  •  
Statter Harbor plan looks to future

The layout plan for Statter Harbor is looking to it's 50-year future, while keeping in mind concerns of the present. The Docks and Harbors Board unanimously approved a design concept for Statter Harbor Thursday. The moorage improvements will not include 24-foot slips - but only 32-foot and 42-foot. A committee looked at four concepts for the harbor, and favored concept 1.

http://juneauempire.com/local/2011-04-02/statter-harbor-plan-looks-future
Local
Rock dump area not zoned for heliport uses

...institutional public use,'' declaring that it be maintained as open space to avoid avalanche and landslide hazards. Our harbor plan contemplates a boat facility and park. A 1977 engineering study deems it unfit for structures (Era plans a terminal...

http://www.juneauempire.com/stories/082299/Ope_regesltr.html
Opinion
Juneau Empire Story Archive

...institutional public use,'' declaring that it be maintained as open space to avoid avalanche and landslide hazards. Our harbor plan contemplates a boat facility and park. A 1977 engineering study deems it unfit for structures (Era plans a terminal...

http://www.juneauempire.com/stories/082299/Ope_regesltr.shtml
Juneau, city of hope

...decisions. Next year we will see forward movement on the Area Wide Transportation Plan, the Tourism Master Plan, the Harbor Plan, and the Juneau Access question. And, hopefully the city's Comprehensive Plan will be updated and acted upon...

http://www.juneauempire.com/stories/122301/opE_editorial.shtml
Opinion
My Turn: New Douglas Harbor parking excessive

...of parking we would still gain 240 parking stalls and have a 60-foot open strip along the water. A truly wonderful harbor plan for all users, such as Sitka's Crescent Harbor, is possible in Douglas. An increase in parking was required along...

http://www.juneauempire.com/stories/070502/opi_myturn.shtml
Opinion
City plans to retool Amalga Harbor plan

Local divers and homeowners are worried about a proposed breakwater at Amalga Harbor.

http://www.juneauempire.com/stories/030608/loc_254443065.shtml
1

CONTACT US

  • Switchboard: 907-586-3740
  • Circulation and Delivery: 907-586-3740
  • Newsroom Fax: 907-586-3028
  • Business Fax: 907-586-9097
  • Accounts Receivable: 907-523-2270
  • View the Staff Directory
  • or Send feedback

ADVERTISING

SUBSCRIBER SERVICES

SOCIAL NETWORKING