http://sealaska.com

Refine Search

  •  
  •  
Pelican opens new ferry dock

...The old dock and ramps were replaced by a 6,000 square foot platform dock and two tidal ramps. Construction used galvanized steel pilings, concrete deck panels, and steel framing. Pedestrian got steel tube railing.Also included installation...

http://juneauempire.com/state/2012-10-24/pelican-opens-new-ferry-dock
State
Three school projects may go before voters

...oil tank. The project at Harborview, downtown's elementary school, is intended to replace the water system's galvanized steel pipes, which have rusted, with copper pipes. The school's water is discolored but not unsafe, the school district...

http://www.juneauempire.com/stories/073103/loc_schoolvotes.shtml
News
Voters to decide on bonds for Juneau School District

...squandering enough. They could have done this long ago." The proposed bonds also include $422,000 to replace rusting galvanized steel water pipes at Harborview Elementary School downtown. The water has been discolored for years, and the water pressure...

http://www.juneauempire.com/stories/092203/loc_bonds.shtml
News
Pipeline pierced by bullet

...to reduce their production by 5 percent during the shutdown. The 48-inch pipe is protected by an outer layer of galvanized steel and nearly 4 inches of insulation. The steel wall of the pipe is about a half-inch thick. Indentations from bullets...

http://www.juneauempire.com/stories/100501/sta_pipeline.shtml
News
Don Smith Editorial

...mechanical upgrades. Harborview Elementary School would receive $422,000 from the fund to replace rusting, clogged, galvanized steel water pipes. A yes vote for Proposition 1 will enable completion of long-overdue repairs and upgrades to two aging...

http://www.juneauempire.com/stories/100603/opi_editorial.shtml
Opinion
Voters approve school renovation bonds

...work might take place in the summer of 2005, Mueller said. The bonds also included $422,000 to replace rusting galvanized steel water pipes at Harborview Elementary School downtown. The water has been discolored for years, and the water pressure...

http://www.juneauempire.com/stories/100803/loc_schoolbond.shtml
News
Juneau Empire Story Archive

...2,000, McCurry said. Preliminary design work has begun on a new piping system to replace the 25-year-old galvanized steel in the building, but it will have to be part of a capital projects bill in the Legislature, he said. Share this...

http://www.juneauempire.com/stories/091300/Loc_Briefly.shtml
Slack Tide: Alaska Airlines Pre-boarding announcement

...reserved for members of our MVP Galvanized Steel Wrapped in Vulcanized Cadmium...reminds me, present your MVP Galvanized Steel Wrapped in Vulcanized Cadmium...coincidentally include a fair amount of galvanized steel wrapped in vulcanized cadmium...

http://juneauempire.com/neighbors/2012-02-26/slack-tide-alaska-airlines-pre-boar
Neighbors
Briefly

...2,000, McCurry said. Preliminary design work has begun on a new piping system to replace the 25-year-old galvanized steel in the building, but it will have to be part of a capital projects bill in the Legislature, he said.

http://www.juneauempire.com/stories/091300/Loc_Briefly.html
Local
School district wants more repair funding

...system and oil tank. At Harborview, the bond proceeds would allow the district to replace the water system's galvanized steel pipes, which have rusted, with copper pipes. The school's water is discolored, although not unsafe, said Superintendent...

http://www.juneauempire.com/stories/062303/loc_schoolmoney.shtml
News

CONTACT US

  • Switchboard: 907-586-3740
  • Circulation and Delivery: 907-586-3740
  • Newsroom Fax: 907-586-3028
  • Business Fax: 907-586-9097
  • Accounts Receivable: 907-523-2270
  • View the Staff Directory
  • or Send feedback

ADVERTISING

SUBSCRIBER SERVICES

SOCIAL NETWORKING