Refine Search

Empire Readers' Council Editorial: Statter Harbor Phase II better than it looks

...Master Plan, which city planners are creating to develop and improve the area.According to chief project designer Dick Somerville of PND Engineers, the Phase II parking lot plan is designed to accommodate 100 vehicles with trailers, an additional...
Statter Harbor to get boardwalk, pavilion

...lot at the harbor will accommodate 84 vehicles and will be surrounded by landscaping, said chief project designer Dick Somerville of PND Engineers. The lot will also have 12 feet by 50 feet spaces for vehicles towing trailers. The driving lanes...
City picks foam floats for Aurora Harbor rebuild

...comments with wider docks, Wi-Fi and longer-lasting docks on updated designs for the Aurora Harbor rebuild.Dick Somerville, vice president of PND Engineers spoke to the Docks and Harbors Planning Committee meeting on Thursday. The committee...
Cruise ship docks to see borehole drilling

...He asked if the fees listed had changed from what the City and Borough of Juneau Assembly approved in September. Dick Somerville, vice president of PND, said the fees are simply a breakdown of the lump sum in the already-submitted request...
Douglas dredging bill doubles

...firm involved with the project, declined to comment today because the dispute is a contract issue, Vice President Dick Somerville said. The company authored some of the Douglas Harbor soil reports. In the end, work on the project ran 130 days...
Business Digest

...inventory staff. The Tongass encompasses 10 ranger districts. Somerville named engineer of the year JUNEAU - Charles (Dick) Somerville was named Alaska Capital Engineer's 2007 Engineer of the Year during a banquet Feb. 24 at Twisted Fish restaurant...
Public weighs in on harbor project

...improvements is a reconfiguration of the harbor's moorage float capacity."There's actually fewer spaces," said Dick Somerville, vice president of PND Engineers, the engineering firm on the project. "Overall, boats are becoming larger, and...
Aurora Harbor upgrades discussed

...coming to the harbor."Overall it accomplished what the original objective was - to reduce smaller vessels," said Dick Somerville, PND Engineers, Inc. Vice President, Juneau.Existing capacity for 24-foot vessels is 184 with a proposed capacity...
Assembly votes to begin cruise dock improvements

...was for the preparatory work needed to get ready for the detailed dock design documents to bid. The proposal from Dick Somerville, PND's vice president and project engineer, showed a comprehensive outline of tasks that would be accomplished...
Downtown traffic to be studied

...efficient layout. The contract is going to PND Engineers. Calls to the firm's Juneau office were referred to engineer Dick Somerville, who could not be reached for comment. The city's Docks and Harbors Board already approved the contract Dec...


  • Switchboard: 907-586-3740
  • Circulation and Delivery: 907-586-3740
  • Newsroom Fax: 907-586-3028
  • Business Fax: 907-586-9097
  • Accounts Receivable: 907-523-2270
  • View the Staff Directory
  • or Send feedback